Project Description

i3 ACADEMY

PROJECT DESCRIPTION

The Project will design and construct a new 41,000 s.f. Elementary School with an enrollment of 420 students. The school campus also includes a 5,000 sf multi-purpose gymnasium/storm shelter and all associated faculty/staff parking. A portion of the parking lot features a pervious concrete pavement to enhance infiltration and reduce surface runoff.

The proposed school will be built on the site of the existing former First Baptist Church of Woodlawn and is home to the largest charter school in Alabama.

Efforts were coordinated with other architectural disciplines to provide a comprehensive design. Engineering services include topographic survey, civil site design, site grading and drainage plan, erosion and sediment control plans, utility systems design, civil construction details and construction administration.

OWNER

Woodlawn Foundation

PROJECT SIZE

1.8 Acres

CONSTRUCTION COST

$10,000,000

COMPLETION

Ongoing

SERVICES

Civil Site
Surveying